stages of construction

after the lot is cleared and the site is ready construction begins

the footings are poured



foundation


preparing crawl space



framing the floor system


sub-floor


wall framing



roof system framed


roof sheathing


moisture barrier


shingles/windows installed


siding


ceiling/columns installed


brick veneer




fire place chimney


copula and weather vein installation


finish drywall


stamped concrete patio


cultured stone wall


marble fire place profile


interior trim



custom cabinets installation


tile shower



interior painting



yard graded


preparing for concrete drive


forming concrete drive




pouring and finishing concrete drive


landscaping and irrigation