after the lot is cleared and the site is ready construction begins
the footings are poured
foundation
preparing crawl space
framing the floor system
sub-floor
wall framing
roof system framed
roof sheathing
moisture barrier
shingles/windows installed
siding
ceiling/columns installed
brick veneer
fire place chimney
copula and weather vein installation
finish drywall
stamped concrete patio
cultured stone wall
marble fire place profile
interior trim
custom cabinets installation
tile shower
interior painting
yard graded
preparing for concrete drive
forming concrete drive
pouring and finishing concrete drive
landscaping and irrigation